Getting ready to move into our new facility in last half of January start of February. Then will start the process of filling the tank. Decided to cap the 4 existing closed-loop holes down the center line with PVC plugs since its PVC bottom and then drill 4 2" holes in the 4 corners and add a Hydrotube 63 in an "H" configuration to replace the 2 Vectra pumps to power the closed loop. Corner holes will allow better flow control with the Hydrotube. I will post updates including pictures in Jan-Feb.