Bought a varios2 pump to run a dedicated manifold off it in my sump. The line will.be 3/4 from pum . Then Tees to 2 media reactors. Also a uv sterilizer off 3/4 line. They all will have gate valves. Question is 3/4 from pump. Should it T to 3/4 uv first then have the 1/2 reducing Tees after that to branch to the 2 media reactors. Or.
3/4 from pump to the 2 reduction tees to 1/ . And then the 3/4 PVC continues to uv after that?
Does it even matter? Especially since I have gate valves for each one to slow flow and create some back pressure. But i want like 300gph in uv. And not sure about medias
If I make no sense just tell me to draw it. I'll do some hack drawing while at work
3/4 from pump to the 2 reduction tees to 1/ . And then the 3/4 PVC continues to uv after that?
Does it even matter? Especially since I have gate valves for each one to slow flow and create some back pressure. But i want like 300gph in uv. And not sure about medias
If I make no sense just tell me to draw it. I'll do some hack drawing while at work