i want to run a closed loop on my 300g. i removed the weirs and plan to use the 4 predrilled holes for the closed loop. i will end up drilling the side to install an external overflow but i dont want to drill more holes in the bottom because its pretty thick @ 19mm. sides are 12mm. or am i being too nervous. i heard drilling thick glass is tougher. 4 holes seem like enough to me for a closed loop?
the bottom predrilled holes are 1.75" (44.5mm) so im guessing i can run schedule 80 bulkheads @1". i read flow through 1" is maxed out at like 3500 or something close. does anyone have any thoughts on how to make this work best? should i use just 1 hole as the drain and 3 as returns or just go 2 drains 2 returns? guessing i can have more flow if i use two drains?
im looking at these bulkheads, any experience, opinions or other suggestions?
im not even sure this is sch80 - it says thick wall? idk what that means
the bottom predrilled holes are 1.75" (44.5mm) so im guessing i can run schedule 80 bulkheads @1". i read flow through 1" is maxed out at like 3500 or something close. does anyone have any thoughts on how to make this work best? should i use just 1 hole as the drain and 3 as returns or just go 2 drains 2 returns? guessing i can have more flow if i use two drains?
im looking at these bulkheads, any experience, opinions or other suggestions?
Schedule 80 Bulkhead Slip to Slip
Professional Aquarium Bulkhead Style: Slip to Slip Available in: 1/2in, 3/4in, 1in, 1.25in, 1.5in and 2in
www.coralvue.com
im not even sure this is sch80 - it says thick wall? idk what that means