- Joined
- Jun 20, 2015
- Messages
- 270
- Reaction score
- 293
Hi Vinny,
The KH director I ordered from you arrived and I'm in the process of setting it all up, but I have hit a wall. I should say this is my second KH director - the first one was set up with no problems following your youtube videos and is working well.
I update the firmware on the new profilux 4. I have measured all the tubing, calibrated the pumps, assigned the calibrated pumps to the sample, reagent and waste functions, and calibrated the pH probe. However, I am stalling at the flush measurement cell stage. This button just doesn't do anything when selected - neither in GCC nor in myghl. The vent and empty measurement buttons don't do anything either. The director is connecting to the profilux though as the pH probe calibrated without issue. Any ideas what the issue could be?
Thanks,
Rob
@Vinny@GHLUSA
The KH director I ordered from you arrived and I'm in the process of setting it all up, but I have hit a wall. I should say this is my second KH director - the first one was set up with no problems following your youtube videos and is working well.
I update the firmware on the new profilux 4. I have measured all the tubing, calibrated the pumps, assigned the calibrated pumps to the sample, reagent and waste functions, and calibrated the pH probe. However, I am stalling at the flush measurement cell stage. This button just doesn't do anything when selected - neither in GCC nor in myghl. The vent and empty measurement buttons don't do anything either. The director is connecting to the profilux though as the pH probe calibrated without issue. Any ideas what the issue could be?
Thanks,
Rob
@Vinny@GHLUSA