How do I plumb this tank?

dzel

Active Member
View Badges
Joined
May 18, 2010
Messages
150
Reaction score
32
Rating - 0%
0   0   0
I have a Cadlights 50g that has been sitting empty for a few years and I finally want to start it up. The holes drilled on this seems to be metric at 22mm for the two smalls holes and 42mm for the middle large hole. I can seem to find any plumbing that can be close to this in either metric or imperial. I had another one of these tanks that had all the plumbing included and I sold that one a few years ago. Now trying to get back into it again.

Any suggestions would be greatly welcome!

IMG_8611.jpeg IMG_8608.jpeg IMG_8609.jpeg
 
OP
OP
dzel

dzel

Active Member
View Badges
Joined
May 18, 2010
Messages
150
Reaction score
32
Rating - 0%
0   0   0
Good luck on 22mm but for the other one:
1" ABS Bulkhead68mm/2.67"42mm/1.65"1” PVC or 1” NPT Threads

Note: You should remove Emergency Icon....just IMO.
Thanks!

How do I remove that? I don’t think I even added the emergency icon. Appreciate it!
 

TOP 10 Trending Threads

WHAT AMOUNT OF LIVE ROCK AND SAND SHOULD BE PRIORITIZED FOR OPTIMAL BIODIVERSITY/FILTRATION?

  • 100% live rock + bagged sand

    Votes: 34 27.0%
  • 100% dry rock + 100% live sand

    Votes: 45 35.7%
  • 50/50 live/dry rock, 50/50 live/bagged sand

    Votes: 27 21.4%
  • 75% live rock, 25% live sand

    Votes: 11 8.7%
  • 25% live rock, 75% live sand

    Votes: 9 7.1%
Back
Top