So after a year I finally have started on the stand for my 90gal. I decided to forego the leveling feet for a more even load distribution because I’m on a raised foundation. The floor is pretty level but once the final welds are made the welder is worried that the heat might force the stand out of being 100% square. Will a self-leveling mat like the ones intended for under the tanks eliminate the need for shims in case it’s not 100% level when put in place?
Thanks!
Thanks!