- Joined
- Apr 28, 2019
- Messages
- 433
- Reaction score
- 753
Plumbed the UV loop today all the way to the chamber that it's pump will feed from and the return lines into the tank.
Found some nice PVC pipe hangers from BRS that work well to suspend the pipe under my aluminum support rails.
Also have a check valve and union ball valve plumbed in wherever a pump will be so I have a shutoff for maintenance.
This plumbing is slow but I'm almost there. Just need to plumb the main return pump / manifold in and I'll be set!
Found some nice PVC pipe hangers from BRS that work well to suspend the pipe under my aluminum support rails.
Also have a check valve and union ball valve plumbed in wherever a pump will be so I have a shutoff for maintenance.
This plumbing is slow but I'm almost there. Just need to plumb the main return pump / manifold in and I'll be set!