I have a MM24 with 3 1-1/2 bulk heads.
question 1: my sump has 2 1” return wholes. I intend to reduce 1-1/2 to 1”
On two of the drains. Where is the best place to reduce? At the bulk head? At the gate valve? Or at the sump?
question 2: should I make a u pipe or just run a screen on main drain?
please post pictures of you installed
Yours. Thanks.
question 1: my sump has 2 1” return wholes. I intend to reduce 1-1/2 to 1”
On two of the drains. Where is the best place to reduce? At the bulk head? At the gate valve? Or at the sump?
question 2: should I make a u pipe or just run a screen on main drain?
please post pictures of you installed
Yours. Thanks.