- Joined
- May 22, 2017
- Messages
- 486
- Reaction score
- 347
I'm trying to work out the flow rate for my TMC Vecton 600 25w that I have plumbed direct to my display. The display is roughly 80G after rock and sand.
From my understanding for UV to be effective you need a x3 turn over rate. 80g x 3 works out to a flow rate of 240G p/h or 900L p/h
I've got a 1L measuring container, there are 3,600 seconds in 1 hour.
To hit 900L p/h I need to have that container fill in 4 seconds.
That's my question, based on all the above if I tune my UV flow rate to fill a 1L container in 4 seconds, that should be achiveing my 240G p/h.
Sound right? ;Bookworm
From my understanding for UV to be effective you need a x3 turn over rate. 80g x 3 works out to a flow rate of 240G p/h or 900L p/h
I've got a 1L measuring container, there are 3,600 seconds in 1 hour.
To hit 900L p/h I need to have that container fill in 4 seconds.
That's my question, based on all the above if I tune my UV flow rate to fill a 1L container in 4 seconds, that should be achiveing my 240G p/h.
Sound right? ;Bookworm