- Joined
- Oct 30, 2016
- Messages
- 18
- Reaction score
- 50
Can anyone give me advice on how to plumb a tank, the 1.5” bulkheads are drilled on the bottom of the tank. Obviously if return pump fails/power outage, etc. Tank would drain completely. This tank was in operation for 20+ years before it was given to me. I saw the original plumbing but it didn’t seem to make sense so hoping someone can give me a clear game plan. I want to plumb it keeping the bulkheads in bottom, I believe it will give the tank great turnover and make it hard for detritus to accumulate (will b bare bottom). I know the lines have to go above the waterline to break the siphon but that’s all I know. Please give as much detail as possible