Power Outages: powerheads 30mins an hour

  • Thread starter Thread starter jabeuy
  • Start date Start date
  • Tagged users Tagged users None

jabeuy

Active Member
View Badges
Joined
Sep 17, 2014
Messages
119
Reaction score
26
Location
Toronto
What state or country do you live in
Canada
Rating - 0%
0   0   0
I’ve set up my Apex to do power monitoring with the 12v auxiliary, so it will turn off all outlets aside from my powerheads when theres an outage. The apex eb8 is hooked up to a UPS to allow this to happen.

Question is: does anyone know if it is possible to have those powerhead outlets turn on only turn on for X minutes every hour to prolong the UPS battery life?

Thanks!
 
Did you ever get this figured out?
 
Go to the dashboard, select whatever outlet your powerhead is plugged into and select “powerhead” as the outlet type…
Set your on/off to whatever you want
 
Go to the dashboard, select whatever outlet your powerhead is plugged into and select “powerhead” as the outlet type…
Set your on/off to whatever you want
Thanks! Good to know.

Do you know of a way to get a schedule like that to trigger only when the power is out?
I am trying to replicate how Hydros controllers have a low power mode which makes their Wave engine send half power to the pumps
 
I
Thanks! Good to know.

Do you know of a way to get a schedule like that to trigger only when the power is out?
I am trying to replicate how Hydros controllers have a low power mode which makes their Wave engine send half power to the pumps
Duh ... re-read
Sorry for the dumb reply...
 
Thanks! Good to know.

Do you know of a way to get a schedule like that to trigger only when the power is out?
I am trying to replicate how Hydros controllers have a low power mode which makes their Wave engine send half power to the pumps

What pumps do you have? Some more directly controllable and you could adjust their intensity directly (wavs, mps via mxm, etc)

For everything else you can setup a pump profile then use power detection to switch the outlet to that profile and control on/off time there.
 
What pumps do you have? Some more directly controllable and you could adjust their intensity directly (wavs, mps via mxm, etc)

For everything else you can setup a pump profile then use power detection to switch the outlet to that profile and control on/off time there.
On this system its just a normal AC powerhead.

Thanks I’ll look into the pump profiles, that sounds like it could work
 

WHAT MOST MAKES A BLACK FRIDAY REEF DEAL WORTH CONSIDERING?

  • A real discount on something already on my list

    Votes: 46 76.7%
  • Free or reduced shipping

    Votes: 9 15.0%
  • A useful bundle of gear or supplies

    Votes: 2 3.3%
  • A good price on livestock I’ve already researched

    Votes: 13 21.7%
  • A rare chance to get something hard to find

    Votes: 11 18.3%
  • A seller or brand I trust

    Votes: 11 18.3%
  • I buy when I need something, sale or not

    Votes: 12 20.0%
  • Other (Post in the comments)

    Votes: 1 1.7%
Back
Top
Home
Post thread…
Market
What's new