- Joined
- Nov 24, 2019
- Messages
- 32
- Reaction score
- 26
What I am wondering is if it is possible to program lead/lag into this system. I have a 650 gallon display that I am currently setting up and I have 4 500W titanium heaters. I would like to group them in pairs on two different EB832 and on two different outlets. I would like to have them alternate as the first pair to come on at 78 degrees and go off at 78.5 degrees. But if temperature drops below say 77.5 degrees the other pair will come on to assist or if there is a power fail on one of the outlets that is supposed to be on. Is this possible?