pvc plumbing

Okay... I get that...

But remember you will reduce flow by adding a manifold. So you will need a stronger pump to continue providing the flow rate you currently have to your return while having extra flow available for the additional equipment you wish to run.

Is a second pump dedicated to the additional equipment you wish to install possible?
not really enough room for another pump but as ive said previous I bought an oversized pump with the intention of running extra equipment
 

TOP 10 Trending Threads

WHAT DO YOU ALWAYS RUN OUT OF AT THE WORST TIME?

  • Salt mix

    Votes: 12 16.4%
  • Fish or coral food

    Votes: 4 5.5%
  • Test kits or reagents

    Votes: 7 9.6%
  • Filter media or replacement fleece

    Votes: 4 5.5%
  • RO/DI filters or supplies

    Votes: 12 16.4%
  • Fragging and repair supplies, like glue or epoxy

    Votes: 8 11.0%
  • I keep a backup of everything

    Votes: 20 27.4%
  • Other (Post in the comments)

    Votes: 6 8.2%
Back
Top
Home
Post thread…
Market
What's new