OOOOHhhhhhh boy another egg crate question!
WRONG!
Im looking to do a conecpt with either eggcrate or marine safe starboard...
Only difference is i want to super glue the base rock with PVC piping approx the same height as the sand bed.
WHY?
- I plan on having a goby and shrimp mix and the tunnels the dig around the rock i dont want to be affected. byhaving them on stilts, i hope to keep the pair from knocking them over.
- Eggcrate/starboard is to keep the stilts from shifting. My hope is to after getting the rocks secured on a sold base with the stilts to then super glue them to the starboard.
Sounds like a lot of permiment glueing huh? Dont worry! I just want the base to be glued in, the rest of the rock will be held in by gravity.
What are your thoughts?
I attached a picutre below to give you more of an idea
(this is not my rock scape)
WRONG!
Im looking to do a conecpt with either eggcrate or marine safe starboard...
Only difference is i want to super glue the base rock with PVC piping approx the same height as the sand bed.
WHY?
- I plan on having a goby and shrimp mix and the tunnels the dig around the rock i dont want to be affected. byhaving them on stilts, i hope to keep the pair from knocking them over.
- Eggcrate/starboard is to keep the stilts from shifting. My hope is to after getting the rocks secured on a sold base with the stilts to then super glue them to the starboard.
Sounds like a lot of permiment glueing huh? Dont worry! I just want the base to be glued in, the rest of the rock will be held in by gravity.
What are your thoughts?
I attached a picutre below to give you more of an idea
(this is not my rock scape)