RS s1000 G2 Return Line modification to 1.0 inch

Steve Hedges

New Member
View Badges
Joined
Mar 8, 2022
Messages
15
Reaction score
39
Location
Cincinnati
Rating - 0%
0   0   0
I have a new Red Sea s1000 G2. The sump comes with pre assembled drain and return lines. I would like to install a UV and flowmeter By modifying the return lines to 1.0 inch

My preference would be to start the conversion from metric to standard at the larger flange under the sump. I believe this is near 1 1/4 inch fitting. The other option is to cut the red hard pipe return line which looks to be 3/4 inch.

Is there a transition fitting for the large female return flange? What fitting is used for transition with the red hard return line?
Any help is greatly appreciated !!!
Thanks !!!
603FD1BF-8C39-4A7C-B161-D7AA2968052B.jpeg
4C7F83BB-D75B-4850-AF59-A7302F791DE9.jpeg
 

Caring for your picky eaters: What do you feed your finicky fish?

  • Live foods

    Votes: 9 24.3%
  • Frozen meaty foods

    Votes: 31 83.8%
  • Soft pellets

    Votes: 7 18.9%
  • Masstick (or comparable)

    Votes: 1 2.7%
  • Other

    Votes: 2 5.4%
Back
Top