Finally getting around to doing a plumbing mock up for my SCA 150 with a Trigger CR 44 sump and looking for opinions/feedback. First time plumbing a tank. Not as much space as I thought I’d have under the stand but I think this will work. Herbie style overflow with two Adaptive Reef manifolds.
Id appreciate some feedback or opinions as this is my first time doing hard plumbing. Had trouble getting everything to fit space wise so this is the best I’ve been able to come up with. Tried to use unions everywhere when it’s feasible with the space I have.
Main drain view without the emergency drain. Union at the bulkhead and before the gate valve.
Emergency drain- not enough space with the primary drain gate valve to do a straight 90 so two 45’s into the intake.
Return with the manifold on the T fitting and the Apdx flow meter leading to the bulkhead.
Id appreciate some feedback or opinions as this is my first time doing hard plumbing. Had trouble getting everything to fit space wise so this is the best I’ve been able to come up with. Tried to use unions everywhere when it’s feasible with the space I have.
Main drain view without the emergency drain. Union at the bulkhead and before the gate valve.
Emergency drain- not enough space with the primary drain gate valve to do a straight 90 so two 45’s into the intake.
Return with the manifold on the T fitting and the Apdx flow meter leading to the bulkhead.