- Joined
- Jun 16, 2019
- Messages
- 272
- Reaction score
- 117
Just trying to think through the best way to plumb a UV into a new system
Looking at the G2 Red Sea reefers which now have 2 separate return lines
That got me thinking — could I place a second return pump in the skimmer chamber that feeds the UV sterilizer?
The return pump chamber is pretty small so 2x return pumps would be a tight fit anyway — if I moved the second return pump to the skimmer chamber that would be a much better fit, and allow me to use less pumps as a separate UV pump would not be required.
Any big concerns I’m overlooking? Diagram I drew of overhead view of sump — actual website view of sump below for ref.
Looking at the G2 Red Sea reefers which now have 2 separate return lines
That got me thinking — could I place a second return pump in the skimmer chamber that feeds the UV sterilizer?
The return pump chamber is pretty small so 2x return pumps would be a tight fit anyway — if I moved the second return pump to the skimmer chamber that would be a much better fit, and allow me to use less pumps as a separate UV pump would not be required.
Any big concerns I’m overlooking? Diagram I drew of overhead view of sump — actual website view of sump below for ref.