ok its been awhile since I updated this thread, I have been on travel several time but have made some very good progress on the build.
Here is the stand base with the stain applied with no clear coat over it yet.
Got the stain applied to everything, it all still need the polyurethane applied.
Well got the polyurethane applied and decided it was time to start the leak testing.
Well after it was filled and running I started getting a flushing effect in my overflow so I had to rework my
drain plumbing. I removed the hard pvc and went with a union and flex pvc.
On to the canopy, the lights, fans and lid hinges have been installed.
So right now I only have to finish up the magnets on the doors, and update my RKL and It will be ready to move in the house.