So I picked up this used 210g tank. I am looking for thought as to how should setup plumbing. Here are couple pictures to see what holes etc are there now. It has dual overflow boxes right now in each corner. Right have has (2) 1" and (1) 1 1/2" bulkhead hole and left side (1) 1" and (1) 1 1/2" bulkhead hole. On bottom middle of tank there are (2) 1" and (1) 1 1/2" bulkhead holes.
What I was thinking was putting a Fiji Cube 2000gph center external overflow on back middle. Then setup bean animal overflow down to my 75g sump. Remove the left and right overflow towers. Then maybe drilling (2) 3/4" or 1" return bulkhead on upper left and right back for return using my Vertra L2 pump. Then getting some glass sheets to plug up bulkhead holes where towers were.
Then using the center bottom 1 1/2" bulkhead hole to drain down into my 55watt UV. On the UV outlet place gate valve so can control flow into external pump and return water to the (2) left and right bulkheads on bottom of tank.
Please I am open to suggestions with hole drilled now or thoughts on idea. I am planning on working on this very soon as our 150g tank needs be replaced. Seam leaking so need get moving.
What I was thinking was putting a Fiji Cube 2000gph center external overflow on back middle. Then setup bean animal overflow down to my 75g sump. Remove the left and right overflow towers. Then maybe drilling (2) 3/4" or 1" return bulkhead on upper left and right back for return using my Vertra L2 pump. Then getting some glass sheets to plug up bulkhead holes where towers were.
Then using the center bottom 1 1/2" bulkhead hole to drain down into my 55watt UV. On the UV outlet place gate valve so can control flow into external pump and return water to the (2) left and right bulkheads on bottom of tank.
Please I am open to suggestions with hole drilled now or thoughts on idea. I am planning on working on this very soon as our 150g tank needs be replaced. Seam leaking so need get moving.