Finally Picked up my HDPE top and bottom after levelling the stand bracing - 0.35mm deviation is the biggest between the cross braces under the tank.
Went with 20mm for under the tank and 10mm for the bottom of the stand. Will need a cross brace for the equipment side of things to stop it sagging. For sump half, should be fine.
Have started planning some the plumbing for the chiller / UV. Sorted out the location of the hole going through the wall, Lot of obstacles in the way - AC plumbing on other side, beams in the wall but finally found a clear path. Have been trying to keep the plumbing efficient with the lease number of bends and joins.
Hole for ventilation mapped out, now have to brave going in the roof to install it- of course the weather has increased to 32c so ill probably put it off - and its a mission to get to the location above the tank. The roof structure surrounding the manhole is an absolute obstacle course. At the same time, put some timber between the beams for the lights to hang off.
I also have to plan out the electrics, getting my electrician to install a sub board for the tank with multiple breakers.