I have some equipment I want to test out on my reefer 350 that will be moved into my house from a friend’s basement in about a month. His basement is concrete and very unlevel. I shimmed several of the feet and was able to have it leveled close. See pics. Think I’m good to test fill and run return pump, etc for a day or two?