Apex IF & DoW Timers Help

TangoTang

Active Member
View Badges
Joined
Dec 8, 2015
Messages
119
Reaction score
89
Location
Miami
Rating - 0%
0   0   0
Hi I’d like some help

So I want to run a power head to clean debris from the bottom of my tank everyday expect the weekends from 7am to 8am. when this power head is on I want my other power heads and gyre to be off.

my program for the power head that will clean the tank is this:

If Time 07:00 to 7:59 Then On
If DoW S-----S Then OFF

now when I apply this to the rest of my power heads including the gyre that I want working all the time except when this powerhead turns on I’ve written this for the rest of the pumps just mentioned:

If Time 07:00 to 7:59 Then OFF
If DoW S-----S Then OFF

the problem I’m facing is that the last line is being read as turn off the gyres and main pumps on the weekend and they don’t run on Saturday or sunday. How do I have the main pumps run all the time while still including this schedule I want to incorporate

hope I explained this correctly and I’ll be open to suggestions on how to better this schedule

any form of support is appreciated thank you guys in advance and for this great tutorial as well
 

Ingenuity against algae: Do you use DIY methods for controlling nuisance algae?

  • I have used DIY methods for controlling algae.

    Votes: 40 48.8%
  • I use commercial methods for controlling algae, but never DIY methods.

    Votes: 17 20.7%
  • I have not used commercial or DIY methods for controlling algae.

    Votes: 19 23.2%
  • Other.

    Votes: 6 7.3%
Back
Top