apex variable speed cable question

ddc0715

Valuable Member
View Badges
Joined
Jun 8, 2018
Messages
1,187
Reaction score
615
Rating - 0%
0   0   0
so i may be moving my kessil 360we to my new fowler tank because I will de replacing them with red sea 160 lights, my fowler is about 35-40 feet from my apex vs ports so. i already have run an apex pm1 module to the fowler tank

1. do they make really long vs cables
or
2. will I need the purchase the VDM LED & Pumps Control Module?

so that i can still have apex control of my fowler tank lights, the red sea lights as some may know are app-controlled. side note-- with most everything starting to go app-controlled i wonder if there is a need for an apex is the far future.
 

ca1ore

10K Club member
View Badges
Joined
Oct 28, 2014
Messages
14,193
Reaction score
19,713
Location
Stamford, CT
Rating - 100%
2   0   0
I spliced cat5 cable into the kessil control cable to run it about 25 feet. Imagine that would work for 40 also.
 

ca1ore

10K Club member
View Badges
Joined
Oct 28, 2014
Messages
14,193
Reaction score
19,713
Location
Stamford, CT
Rating - 100%
2   0   0
Just like you’d splice anything ..... make sure to connect up the same wires. Not pretty but it works.

0739A411-9E69-498E-9B26-01B6C399E14D.jpeg
AA210AC3-2D40-42C5-9699-ECF60B93319A.jpeg
 

TOP 10 Trending Threads

Back
Top