Can my floor support it

Th0rn

Well-Known Member
View Badges
Joined
Nov 17, 2015
Messages
714
Reaction score
279
Location
York, PA
Rating - 0%
0   0   0
I need some help from the builders and structural engineers on here. I stumbled across a ridiculous deal on my dream 300 gallon deep dimensions tank (6ft L x 3ft W x 27” T). I was initially gonna put a 150 gallon tank in this spot (hence the plumbing). I am concerned if my floor can support it. Can anyone help me?

I laid out a tape measure one floor and then hung it from the ceiling to show how far it comes out from the load bearing beam. It would be sitting on 4 of the joists.

IMG_5907.jpeg IMG_5908.jpeg IMG_5909.jpeg
 

littlefoxx

10K Club member
View Badges
Joined
Dec 25, 2022
Messages
12,012
Reaction score
12,138
Location
Denver
Rating - 0%
0   0   0
Is the tank parallel to the floor joists or perpendicular? And is that wall load bearing?
 

braaap

Valuable Member
View Badges
Joined
Jul 16, 2015
Messages
2,480
Reaction score
2,729
Location
Montana
Rating - 100%
3   0   0
How are the joists supported on the other side behind you? How long is the span? All those things play a major factor.

Build another support wall underneath those joists to take some of the load and it would likely be more than fine. They look sturdy as is. But it depends on the factors above.
 

KrisReef

Last to get paid.
View Badges
Joined
May 15, 2018
Messages
22,082
Reaction score
39,131
Location
Vatican & Las Vegas Penthouse Quarters
Rating - 100%
1   0   0
I agree completely that the floor can handle the weight without further modifications. Save your money for frags and start a build thread so we can follow the results, either way.

Sad Dog GIF
:smiling-face-with-sunglasses:
 

LPS Bum

Valuable Member
View Badges
Joined
Apr 22, 2021
Messages
1,042
Reaction score
1,393
Location
Colorado
Rating - 0%
0   0   0
Agree with the above. Spend the money ahead of time to hire a structural engineer.

Having said that, if the tank will sit perpendicular to the joists and the wall is load bearing, you’ve got a good shot. That’s how my 240 is configured and it’s done fine for 9 years.
 

theMeat

2500 Club Member
View Badges
Joined
Oct 1, 2017
Messages
3,254
Reaction score
2,677
Rating - 0%
0   0   0
Happy to do a load calculation for you.
What’s the size are the floor joists?
How long do they span between supports?
You say the tank is on 4 joists, so perpendicular to joists?
 

Stevorino

Well-Known Member
View Badges
Joined
Jul 14, 2014
Messages
653
Reaction score
613
Location
Charleston, SC
Rating - 0%
0   0   0
I installed a 280 on the second floor of my last home.

EDIT: By 'Second Floor', I meant the main floor of my home, with a basement underneath. Sorry for confusion!

I had a contractor come in and add vertical supports underneath and expected we would be good to go.

Within a week I noticed the floor dropped enough that the water wasn’t hitting the overflow right.

The deflection on the floor was unreal. I lost many nights of sleep.

I then had an engineer come out and said it was fine temporarily but we needed some LVL (?) beams. He cost me $600 for the plans.

I was in talks to get a contractor to install the beams when we decided to move homes for unrelated reasons.

This is long way of saying: Get an engineer if it isn’t going on a slab.
 
Last edited:

theMeat

2500 Club Member
View Badges
Joined
Oct 1, 2017
Messages
3,254
Reaction score
2,677
Rating - 0%
0   0   0
I installed a 280 on the second floor of my last home.

I had a contractor come in and add vertical supports underneath and expected we would be good to go.

Within a week I noticed the floor dropped enough that the water wasn’t hitting the overflow right.

The deflection on the floor was unreal. I lost many nights of sleep.

I then had an engineer come out and said it was fine temporarily but we needed some LVL (?) beams. He cost me $600 for the plans.

I was in talks to get a contractor to install the beams when we decided to move homes for unrelated reasons.

This is long way of saying: Get an engineer if it isn’t going on a slab.
If the second floor was originally designed for bedrooms, depending on when it was built, it could be as low as 20 psf (pounds per square foot). Someone adding a bathroom without permits after that fact doesn’t count. Whereas the first floor can only be as low as 30. Nowadays 40 on first floor, 30 on second.
The other thing to consider when talking about a tank filled with water that calculations and codes don’t address is bounce. Will the floor bounce when you walk past it with the added weight.
OP’s situation is different, with the basement below. Adding a support looks pretty straight forward in the pics.
 
Last edited:
OP
OP
Th0rn

Th0rn

Well-Known Member
View Badges
Joined
Nov 17, 2015
Messages
714
Reaction score
279
Location
York, PA
Rating - 0%
0   0   0
Not on topic, but those long horizontal runs on your drain might cause issues with flow.
The run is only about 6’. You think that will be an issue? Its dual 1-1/2 inch drains so I thought I would be fine but please correct me if I am wrong Now is the time to fix it lol
 
Last edited:
OP
OP
Th0rn

Th0rn

Well-Known Member
View Badges
Joined
Nov 17, 2015
Messages
714
Reaction score
279
Location
York, PA
Rating - 0%
0   0   0
Happy to do a load calculation for you.
What’s the size are the floor joists?
How long do they span between supports?
You say the tank is on 4 joists, so perpendicular to joists?
I will get you the measurements when i get home
 
OP
OP
Th0rn

Th0rn

Well-Known Member
View Badges
Joined
Nov 17, 2015
Messages
714
Reaction score
279
Location
York, PA
Rating - 0%
0   0   0
I am getting an engineer to come look at it as everyone has recommended. I am building an extra support exactly like the one attached to this post and bolting it into the slab
 

Attachments

  • IMG_5910.png
    IMG_5910.png
    251 KB · Views: 76

Mschmidt

Average Maybe
View Badges
Joined
Feb 9, 2022
Messages
18,574
Reaction score
39,605
Location
Bellingham
Rating - 0%
0   0   0
I am getting an engineer to come look at it as everyone has recommended. I am building an extra support exactly like the one attached to this post and bolting it into the slab
Good call. Even trusting @theMeat and his(her?) knowledge and ability.
 
OP
OP
Th0rn

Th0rn

Well-Known Member
View Badges
Joined
Nov 17, 2015
Messages
714
Reaction score
279
Location
York, PA
Rating - 0%
0   0   0
Unfortunately, yes I do. But even making a pitch of a couple inches will help out a lot. My old setup had only 2 feet of a horizontal run, and it was always a problem to dial in the full siphon.
Okay I will run it at angle into a 45° instead of straight over to a 90° Thanks for the heads up
 

Stevorino

Well-Known Member
View Badges
Joined
Jul 14, 2014
Messages
653
Reaction score
613
Location
Charleston, SC
Rating - 0%
0   0   0
If the second floor was originally designed for bedrooms, depending on when it was built, it could be as low as 20 psf (pounds per square foot). Someone adding a bathroom without permits after that fact doesn’t count. Whereas the first floor can only be as low as 30. Nowadays 40 on first floor, 30 on second.
The other thing to consider when talking about a tank filled with water that calculations and codes don’t address is bounce. Will the floor bounce when you walk past it with the added weight.
OP’s situation is different, with the basement below. Adding a support looks pretty straight forward in the pics.
To clarify, my situation was indeed on the main floor with a basement below. I just refer to it as 2nd floor. Sorry for the confusion.
 

TOP 10 Trending Threads

WHAT AMOUNT OF LIVE ROCK AND SAND SHOULD BE PRIORITIZED FOR OPTIMAL BIODIVERSITY/FILTRATION?

  • 100% live rock + bagged sand

    Votes: 34 26.6%
  • 100% dry rock + 100% live sand

    Votes: 45 35.2%
  • 50/50 live/dry rock, 50/50 live/bagged sand

    Votes: 28 21.9%
  • 75% live rock, 25% live sand

    Votes: 11 8.6%
  • 25% live rock, 75% live sand

    Votes: 10 7.8%
Back
Top