Diy Mixing station

  • Thread starter Thread starter nhendrix
  • Start date Start date
  • Tagged users Tagged users None

nhendrix

Active Member
View Badges
Joined
Dec 28, 2020
Messages
179
Reaction score
125
Location
USA
What state or country do you live in
Tennessee
Rating - 0%
0   0   0
Well tomorrow is the day I build a mixing station for my 240g. Plan is for two 44 gal brutes. I’ll post pics. and prices

Plumbing list
1.5 inch 90s x8. $ 16.55
1.5 inch ball valve x5. $53.65
1 inch ball valve x1. $ 4.98
1.5 inch bulkheads x4. $ 36.76
1.5 inch T. x2. $ 6.62
1.5/1 inch reduced T x1. $ 3.53
1 inch hose barb x1. $ 1.89
1.5 inch union x2 $ 23.06
1.5 inch female adapter x2. $ 4.42
1.5 inch by 10 feet pvc x1. $ 8.96
Total $160.42
 
Last edited:
Dry fix complete glue time
 

Attachments

  • 817A61EA-A6FB-489F-BEBF-7789C3E5ACF0.jpeg
    817A61EA-A6FB-489F-BEBF-7789C3E5ACF0.jpeg
    178.2 KB · Views: 160
  • 7DAFBC42-408C-4765-9262-879B2B072447.jpeg
    7DAFBC42-408C-4765-9262-879B2B072447.jpeg
    82 KB · Views: 148
  • 428D57D3-6657-4F07-A116-A1C9A92EABE3.jpeg
    428D57D3-6657-4F07-A116-A1C9A92EABE3.jpeg
    142.5 KB · Views: 152
It’s a good feeling, I’m sure!

I suppose there is a spigot type valve to shoot out into a hose or bucket? Very useful, of course.
 
Hose barb for direct refill I have 50 ft of clear hose coming

Item update
PVC glue. $ 7.68
44 gal brute can x2. $ 93.94

total. $262.04

I had the wood left over from other diy so thats not in price
 
Last edited:
Leak test complete. now I’ll be able to refill my tank very fast. My float valve is set at about 40gallons x2 and pump is rated at 2600gph but I’ll be useing one inch hose so bring it down to 2k gph it’s going to make short work of my refills
 
Dry fix complete glue time
Nice! I always wanted one of these but I don't really need them because I only have nano and pico tanks.
 
Make a small one you they are great brutes trash cans come in all sizes
 

IF YOU HAD TO OPERATE EVERYTHING ELSE MANUALLY, WHICH AUTOMATED SYSTEM WOULD YOU KEEP?

  • Auto top-off

    Votes: 52 57.8%
  • Automated dosing

    Votes: 6 6.7%
  • Mechanical filtration / roller filter

    Votes: 4 4.4%
  • Automated water testing

    Votes: 3 3.3%
  • Automatic feeding

    Votes: 1 1.1%
  • Lighting schedule

    Votes: 16 17.8%
  • Controller and remote monitoring

    Votes: 3 3.3%
  • Leak detection and emergency shutoff

    Votes: 1 1.1%
  • Automatic water changes

    Votes: 3 3.3%
  • None. I prefer to operate everything manually

    Votes: 0 0.0%
  • Something else (explain in the comments)

    Votes: 1 1.1%
Back
Top
Home
Post thread…
Market
What's new