Hello. Hopefully this is the right place to be posting this. I apologize if it is not.
I am finishing up my plumbing on my tank tonight/tomorrow. I have a quick question for you all.
First of all, the tank is a 100 gallon tank (60x18x21") with one corner overflow on the left hand side of the tank. 1x 3/4" return and 1x 1" drain. I am building a Durso Standpipe for the drain. I have built a 2" Durso that reduces down to 1" to go into the bulkhead. For the return I have a Mag 9.5 from an earlier project that I never ended up using. I'm going to hook that up for the time being and see how it does, to see if I need to up/downsize. I am to the point I need to drill a hole(s) into the top of the Durso's cap, but I didn't want to drill yet.
How many and what size holes should I drill for said setup? I've been reading around online and have found a ton of different answers. I trust this forum for help and advice, so I wanted to check with you all and see what was recommended. Thanks so much. I hope to have the plumbing done tomorrow so I can continue getting everything setup around the beginning of the week.
I am finishing up my plumbing on my tank tonight/tomorrow. I have a quick question for you all.
First of all, the tank is a 100 gallon tank (60x18x21") with one corner overflow on the left hand side of the tank. 1x 3/4" return and 1x 1" drain. I am building a Durso Standpipe for the drain. I have built a 2" Durso that reduces down to 1" to go into the bulkhead. For the return I have a Mag 9.5 from an earlier project that I never ended up using. I'm going to hook that up for the time being and see how it does, to see if I need to up/downsize. I am to the point I need to drill a hole(s) into the top of the Durso's cap, but I didn't want to drill yet.
How many and what size holes should I drill for said setup? I've been reading around online and have found a ton of different answers. I trust this forum for help and advice, so I wanted to check with you all and see what was recommended. Thanks so much. I hope to have the plumbing done tomorrow so I can continue getting everything setup around the beginning of the week.