Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
KHD, IOD, Dosers are all plugged directly into the wall, but are controlled by the P4.Thanks for the reply. So powerheads I guess I don’t necessarily need connected to the controller, I just got two Orphek compacts so those are connected to each other... sorry I’m just trying to sort this out so I know what’s necessary. Return pump for sure, UV, skimmer, I guess those are primary. What about powering any of the Directors? Ion and KH? I wanted to start with the Profilux 4e and just build up from there as funds become available
My return is plugged directly in, and controlled by the Royal Exclusive 1-10v interface.Ok ok that gives me some clarity thanks. So your return pump isn’t on their powerbar either? Do you only have one of their powerbars?
Yes you can - but that you can do with a powerbar too as long as you not exceed the amperage the socket is classed for. Just add extra branch sockets to the same power bar socket.I started looking into their Powerhub 6d-PAB bc it looks like you can run more than one device per channel. But I might be way off on that as well
Yes you can - but that you can do with a powerbar too as long as you not exceed the amperage the socket is classed for. Just add extra branch sockets to the same power bar socket.
Sincerely Lasse
Yep I got you I understood what you meant. Just need to make sure that specific socket isn’t being overloaded. That seems a better idea than buying 3 of the GHL powerbars. Thats about the same cost as one of their KH or Ion directors. Sheesh!...I do not know if I use the right word in english - I´m not native english speaker - but I ment things like this (Europe versions) I think you have similar in the US
Sincerely Lasse
Do you run any GHL components? Pros? Cons? Regrets? Hindsight? do you mind going a bit more in depth into the doubling up of devices on a single socket? did you cut off the plug and hardwire the the two together? Like whats required to use GHLs Powerhub 6d-PAB?Think of the power bars as controllable on off switches. I plug my pumps into my power bars to shut them off and on for feedings and maintenance. But to save sockets you can double up items like pumps on the same socket. Just don’t exceed the amp rating of the powerbar socket. I have 2 MP40s in 1 socket each. Also two Maxspect Gyres in 1 socket. And so on..
I have my skimmer in a socket and control it on and off... well you get the point.
If anything is always going to be on then just use a regular wall socket or a battery back up and surge suppressor.
i just bought the GHL and I love it. it takes patients setting it up.Alright that helps tremendously. Pulling the trigger on the profilux 4e to get things started. Then working my up from there to the KH and Ion directors
Thanks for the info and clearing a few things for me