For all you ecotech gurus out there, specifically the mp40. I just got 2 more mp40 for my tank. So I'm currently running 4 on my 200 gal. My question is this...
I have 2 of the older wes models and 2 of the newer qd models (non mobius). Currently they are all synced up to one of the newer qd models as slaves. I would like to have them controllable remotely and set schedules which mobius provides. Can I get away with swapping the rf chip in only one of the QD versions, the one running as a master, and then that one will control the other 3 that are set as slaves even of they don't not have the mobius compatible rf chip?
I have 2 of the older wes models and 2 of the newer qd models (non mobius). Currently they are all synced up to one of the newer qd models as slaves. I would like to have them controllable remotely and set schedules which mobius provides. Can I get away with swapping the rf chip in only one of the QD versions, the one running as a master, and then that one will control the other 3 that are set as slaves even of they don't not have the mobius compatible rf chip?