Real happy with the Melamine liner for the pocket doors, the vinyl coating should make for an easy wipe down when needed!
Nothing dramatic happened this week did a water change on the Live Rock, got more cabinet faces sanded and stained made a few panels and the support for the granite beer ledge. I mostly made lots of measurements for the end fuge and electronics cabinet, which lead to sketches and CAD drawings and a few adult beverages. It should be pretty straight forward but pocket doors and pivot hinges aren’t normal components of a tank cabinet! I hope to have all the base cabinet work finished by Monday I pick up the granite beer ledge on Tuesday. We Should be milling the sump on Wednesday, he said my CAD files were good to go and would clear out some time for my job.