Outlet on every 6 days

Users Who Are Viewing This Thread (Total: 1, Members: 0, Guests: 1)

kaxt

Community Member
View Badges
Joined
Jan 8, 2019
Messages
55
Reaction score
57
Rating - 0%
0   0   0
I have a solenoid (not a SV-1) on my water line that feeds my RODI system. The solenoid is plugged into an outlet on my eb8. I also have a water softener that runs every 6th night for my well water. I want to program the solenoid to energize every 6th night so that it runs over night the day before my water softener runs. I can't figure out how to do this. Any help would be appreciated. Thanks
 

RussM

Active Member
View Badges
Joined
Jun 4, 2011
Messages
275
Reaction score
195
Location
El Cajon, CA
Rating - 0%
0   0   0
That’s not possible. The Apex can be programmed do do things based on the day of the week, but not every x days.

If you can run your water softener on the same day every week, then you can coordinate the two events as you desire.
 

Dr. Reef

www.drreefsquarantinedfish.com
View Badges
Joined
Jan 22, 2013
Messages
3,521
Reaction score
6,418
Location
Tulsa, OK
Rating - 0%
0   0   0
If you can fix the day of the week and time its possible with using
SMTWTFS THEN OFF
IF TIME xxxx then off
 
OP
OP
K

kaxt

Community Member
View Badges
Joined
Jan 8, 2019
Messages
55
Reaction score
57
Rating - 0%
0   0   0
Thanks for the replies. I can't set the water softener to run on a set day. The frequency of the cycle has to be a whole number divided from 12. So 1, 2, 3, 4, 6, or 12 days. Kinda disappointing that it won't work out the way I thought it could.
 

Ingenuity against algae: Do you use DIY methods for controlling nuisance algae?

  • I have used DIY methods for controlling algae.

    Votes: 31 53.4%
  • I use commercial methods for controlling algae, but never DIY methods.

    Votes: 12 20.7%
  • I have not used commercial or DIY methods for controlling algae.

    Votes: 12 20.7%
  • Other.

    Votes: 3 5.2%
Back
Top