Outlet on every 6 days

kaxt

Community Member
View Badges
Joined
Jan 8, 2019
Messages
55
Reaction score
56
Rating - 0%
0   0   0
I have a solenoid (not a SV-1) on my water line that feeds my RODI system. The solenoid is plugged into an outlet on my eb8. I also have a water softener that runs every 6th night for my well water. I want to program the solenoid to energize every 6th night so that it runs over night the day before my water softener runs. I can't figure out how to do this. Any help would be appreciated. Thanks
 

RussM

Active Member
View Badges
Joined
Jun 4, 2011
Messages
278
Reaction score
200
Location
El Cajon, CA
Rating - 0%
0   0   0
That’s not possible. The Apex can be programmed do do things based on the day of the week, but not every x days.

If you can run your water softener on the same day every week, then you can coordinate the two events as you desire.
 

Dr. Reef

www.drreefsquarantinedfish.com
View Badges
Joined
Jan 22, 2013
Messages
4,290
Reaction score
7,510
Location
Tulsa, OK
Rating - 100%
4   0   0
If you can fix the day of the week and time its possible with using
SMTWTFS THEN OFF
IF TIME xxxx then off
 
OP
OP
K

kaxt

Community Member
View Badges
Joined
Jan 8, 2019
Messages
55
Reaction score
56
Rating - 0%
0   0   0
Thanks for the replies. I can't set the water softener to run on a set day. The frequency of the cycle has to be a whole number divided from 12. So 1, 2, 3, 4, 6, or 12 days. Kinda disappointing that it won't work out the way I thought it could.
 

TOP 10 Trending Threads

WHAT AMOUNT OF LIVE ROCK AND SAND SHOULD BE PRIORITIZED FOR OPTIMAL BIODIVERSITY/FILTRATION?

  • 100% live rock + bagged sand

    Votes: 35 26.9%
  • 100% dry rock + 100% live sand

    Votes: 45 34.6%
  • 50/50 live/dry rock, 50/50 live/bagged sand

    Votes: 29 22.3%
  • 75% live rock, 25% live sand

    Votes: 11 8.5%
  • 25% live rock, 75% live sand

    Votes: 10 7.7%
Back
Top