Recently got this 300g Peninsula and I’m trying to figure out the best way to plumb the drain lines. It has an internal and external overflow box with 3 1.5” bulkheads to connect the boxes ans 3 1.5” bulkheads on the external box for drainage.
I was planning to do
1. primary drain with gate valve
2. Dorso for secondary/set water level
3. Emergency
I’m not sure if there is enough space in the external box for this but if the main drain is low enough I can possibly put the main drain over it?
Also, should I just leave the internal overflow box free of any pipes? I think so but not 100% sure
thanks for your help!
I was planning to do
1. primary drain with gate valve
2. Dorso for secondary/set water level
3. Emergency
I’m not sure if there is enough space in the external box for this but if the main drain is low enough I can possibly put the main drain over it?
Also, should I just leave the internal overflow box free of any pipes? I think so but not 100% sure
thanks for your help!