Getting ready to plumb my 240. I’m having some issues visualizing the setup and I also want to ensure my pump is big enough. I plan on using a Vectra L2. I have two pre drilled holes for 1” return lines. What adapters do I need on the inside of the tank to go from the bulkhead down to 3/4 lock line? Coming up from the pump what’s the best setup? I need to have two lines branches to feed the returns. Id also like to have a manifold with 3 gate valves. 1 for GFO/Carbon reactor 1 for a return line to a small 20 gallon frag tank and one for future use. Is this pump enough? Please help me visualize this so I can buy all the adapters. Since the output on the L2 is 1.25 Should I use 1.5 inch pipe and reduce it down to 1 inch outside the bulkheads and agin down to 3/4 in the tank for the lock line. My thoughts are that this would reduce friction loss.