- Joined
- Aug 3, 2017
- Messages
- 50
- Reaction score
- 21
Wanted to get general opinions on my return plumbing plan from more experienced Reefers.
I will be using a Vectra S2 for my return pump. I plan to use 3/4 PVC to the return bulkheads (one on each end of the back of a 4' tank). I will transition to 1/2" Loc-line on the interior of the tank. Each vertical section of 3/4" pvc going from the mainline to the bulkheads will have a ball valve installed. Total horizontal run will be 5 or 6 feet, and vertical runs will be about 2' from sump to tank then another 20" to bulkheads. Will this be too much head loss for the pump to overcome?
I will be using a Vectra S2 for my return pump. I plan to use 3/4 PVC to the return bulkheads (one on each end of the back of a 4' tank). I will transition to 1/2" Loc-line on the interior of the tank. Each vertical section of 3/4" pvc going from the mainline to the bulkheads will have a ball valve installed. Total horizontal run will be 5 or 6 feet, and vertical runs will be about 2' from sump to tank then another 20" to bulkheads. Will this be too much head loss for the pump to overcome?
