Setting up my mixing station. Before I glue the rest down I want to make sure this checks out. Otherwise what should I modify. I read a few posts where folks said a pipe should be added all the way down to ensure the water is mixing down at the bottom. So I did it. Also added some pipe coming from the bulkhead facing downwards with the thought that it would help siphon water as close to the bottom of the tank as possible. Pump and other storage tank come in tomorrow!

