We moved in June and sold off the 300 gallon DD reef system we had, and its inhabitants.
We're largely settled into our new abode, and as one might expect, the itch has begun. I kept my equipment, as it's all higher end stuff, so I don't expect any large scale procurement to be necessary, save for the new tank, stand, and canopy.
The tank was ordered Thursday last week, and I don't yet have an ETA for completion...which is okay, since I am also building two greenhouses for my side business, and the materials for those arrived today.
As it stands, the new system will be going into the "office" in the basement. A utility sink has been professionally plumbed into the closet of this room, and my RO/DI system is plumbed in. We also had an electrician run two dedicated circuits to the spot where the stand will be set. I will be setting up a mixing station next to the sink, and the plan is to plumb a line from the sump to the sink for water changes, and a line from a mix/heat tank to the sump, enabling water changes to be carried out via throwing of a couple valves, ending bucket lugging and sloshing.
I will post updates as progress is made. I have 6 Gen 4 XR15 Radions and an Apex 2016 waiting to be broken in, and am eager to have a system running again, as it's been much better for my well-being than anything on the airwaves of late. We'll see how this goes...and how quickly!
We're largely settled into our new abode, and as one might expect, the itch has begun. I kept my equipment, as it's all higher end stuff, so I don't expect any large scale procurement to be necessary, save for the new tank, stand, and canopy.
The tank was ordered Thursday last week, and I don't yet have an ETA for completion...which is okay, since I am also building two greenhouses for my side business, and the materials for those arrived today.
As it stands, the new system will be going into the "office" in the basement. A utility sink has been professionally plumbed into the closet of this room, and my RO/DI system is plumbed in. We also had an electrician run two dedicated circuits to the spot where the stand will be set. I will be setting up a mixing station next to the sink, and the plan is to plumb a line from the sump to the sink for water changes, and a line from a mix/heat tank to the sump, enabling water changes to be carried out via throwing of a couple valves, ending bucket lugging and sloshing.
I will post updates as progress is made. I have 6 Gen 4 XR15 Radions and an Apex 2016 waiting to be broken in, and am eager to have a system running again, as it's been much better for my well-being than anything on the airwaves of late. We'll see how this goes...and how quickly!