This is not my first weenie roast however it is my second.
Any issues with plumbing my sump this way, specially my main drain? From left to right I have return #1, main drain, emergency drain, return #2 for UV.
In a perfect world both drains would go straight down but I’m running a Herbie style overflow into a Reefmat at the front of the sump.
My goal with the main drain is to keep it out of the way so it’s not hanging over the sump and getting in the way.
This is dry fitted ATM if it looks wonky.
Any issues with plumbing my sump this way, specially my main drain? From left to right I have return #1, main drain, emergency drain, return #2 for UV.
In a perfect world both drains would go straight down but I’m running a Herbie style overflow into a Reefmat at the front of the sump.
My goal with the main drain is to keep it out of the way so it’s not hanging over the sump and getting in the way.
This is dry fitted ATM if it looks wonky.