thanks
@UncommonSense
read this entire thread.
there is a dramatic difference between thinking and knowing.
the process of proper setup is also to eliminate all potential factors of a failure prior to the tank getting wet.
just a first thought list below....
- following manufactures setup process
- respecting manufactures warranty requirements
- can the foundation handle the weight
- can the floor handle the weight
- is the floor level
- is the floor flat
- are you setting up on the solid surface of the floor (not on carpet)
- construction of the stand
- what standards were used to build the stand
- all stand joints inspected and solid
- stand build that will now allow any swaying
- is stand level
- is stand flat (using a straight edge or string form corner to opposing corner) MUST be flat
- using manufacturer suggested pad
All of this needs to happen prior to filling the tank. The tank cannot handle anything being out and all of the seams could be compromised. Fixing any of above after the tank has water in it, is really too late.
to the question about construction. I have seen this type of construction before. We build a different way. Doesn't mean either are right or wrong. That is really a question for the manufacture.