- Joined
- Oct 26, 2018
- Messages
- 452
- Reaction score
- 191
i have a 180G tank ( 72x24x24) with triton44 sump. It had been drilled for 2x 3/4” return lines and I’ll be using synergy shadow overflow ( 1 1/2”) drain lines. I have attached a picture on what I want my piping to look like and once I get to under my tank I’m thinking I’ll be using hosing to the sump, OR. should I just stick with PVC all the way? I’m just trying to prevent as many elbows as possible. I’m shooting for the 10x turnover but if I can only get 8-10 that’s fine I’ll make adjustments along the way. I’m just curious which jebao DC pump I will need.