Very cool. The evil plan is coming together!
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I started to build last night.
I cut 7" off my basement workbench and added the 2 side pieces. I used wood glue and put 2" screws every 2 inches.
It was actually very strong feeling when i was done. Im going to add the end pieces tonight and then make the overflow cutout and box.
i like the B layout much more.
better able to walk around it.
Why not?those are only 6 inches deep, that wouldnt work
Why not?
Huge frags?
@James Hopkins - I'm sorry but I just have to ask; any relation to Lightin' or Anthony?
got some good work done the past 2 nights. Tomorrow ill be working on the last panel with the overflow then ill be drilling the bulkheads before Pond Shield.
is that Stan lee
I'm cool with that.Looking solid! I may just call you "The 4th" now!
What is between the plywood on the bottom and is that needed?
Also how much pond shield are you using?