So I have a 60mm hole drilled in this tank. I'd like to get a 1" return pipe into the bulkhead however that size it shows only a 1.5" pipe will fit. Whats the best option to get the 1" pipe into the bulkhead? Increase the size to 1.5 prior to the bulkhead? Or is there a bulkhead with larger sides that can make up the difference?

Thanks
 
Do you have another hole in the bottom of tank? What size? Is the 1.5 gonna be a gravity drain or coming from the pump?
 
Do you have another hole in the bottom of tank? What size? Is the 1.5 gonna be a gravity drain or coming from the pump?

There's two 1.5" bulkheads. One for the internal overflow and the 2nd, the one I asked about, is for the return from a 1400 gph pump.
 
How big is the tank? You could move 1400 through 1” pipe.
It's a 75g with a 20 gallon sump. The pump outlet is 1" so I was planning on running 1" to the bulkhead. Was hoping not to have to go up to 1.5" to get through the bulkhead. Then back down to 3/4" for a locline nozzle.
 
You put a bushing in it
serveimage
 
+1 to the bushing.....and if your going down to 3/4” after it doesn’t really matter how you reduce it because the most restriction will be at the 3/4”
 
+1 to the bushing.....and if your going down to 3/4” after it doesn’t really matter how you reduce it because the most restriction will be at the 3/4”

Yeah I've been looking for a reducing bushing to help with the restriction loss. I guess I don't fully understand how the bushing would work inside a bulkhead. The bushing would go on the outside of the bulk head right? If so how would I step it down to 3/4" on the inside of the bushing then?
 
You put a bushing in the connection outside of the tank and a 1 inch pipe fits the 1.5 inch bulkhead. The inside is another connection with more bushings.
 
You put a bushing in the connection outside of the tank and a 1 inch pipe fits the 1.5 inch bulkhead. The inside is another connection with more bushings.

Not really sure how I can go from 1" bushing in a 1.5" bulkhead on the outside. Then have another bushing on the inside of that same bulkhead that changes the 1" PVC to a 3/4" but fills the 1.5" space of. Confusing that's for sure ha.
 
They make a 1 1/2" to 3/4" reducer

https://www.bulkreefsupply.com/schedule-80-reducing-bushing-slip-x-slip.html
You stick short piece of 1 1/2" pipe in the outside bulkhead and then the reducing bushing I linked then your 1" return pipe will go right into that.
Boom 1" pipe into your 1 1/2" bulkhead.
Then you take two reducing threadxthread bushings on the inside of the tank that will drop from 1 1/2" to 1" then the next one will drop from 1" to 3/4" for your loc line.

I did something similar with my build I went from 1" bulkhead to 3/4" for loc line. I just didn't need to reduce into the bulkhead from outside like you are doing.

I posted a pic, you could do something similar but would need two of those gray threaded reducers.
Btw I used a threadxslip bulkhead for that. Threaded in tank and slip backside for the return plumbing.

40b2_LI.jpg
 
It's a 75g with a 20 gallon sump. The pump outlet is 1" so I was planning on running 1" to the bulkhead. Was hoping not to have to go up to 1.5" to get through the bulkhead. Then back down to 3/4" for a locline nozzle.
Ok. Well the bulkhead has to stay 1 1/2” to seal properly. Place a 1 1/2”x 1” reducer on the bottom and 1 1/2”x 3/4” on the inside and that should do it. Why would they drill 1 1/2” bulkhead holes on a 75 gal I can’t understand, but that’s what you got.‍♂️
 

TOP 10 Trending Threads

IF YOU HAD TO OPERATE EVERYTHING ELSE MANUALLY, WHICH AUTOMATED SYSTEM WOULD YOU KEEP?

  • Auto top-off

    Votes: 8 57.1%
  • Automated dosing

    Votes: 0 0.0%
  • Mechanical filtration / roller filter

    Votes: 0 0.0%
  • Automated water testing

    Votes: 0 0.0%
  • Automatic feeding

    Votes: 0 0.0%
  • Lighting schedule

    Votes: 4 28.6%
  • Controller and remote monitoring

    Votes: 2 14.3%
  • Leak detection and emergency shutoff

    Votes: 0 0.0%
  • Automatic water changes

    Votes: 0 0.0%
  • None. I prefer to operate everything manually

    Votes: 0 0.0%
  • Something else (explain in the comments)

    Votes: 0 0.0%
Back
Top
Home
Post thread…
Market
What's new