Closed Loop Options for a 40 Breader

  • Thread starter Thread starter evilc66
  • Start date Start date
  • Tagged users Tagged users None

evilc66

Active Member
View Badges
Joined
Aug 20, 2008
Messages
109
Reaction score
0
Rating - 0%
0   0   0
I'm setting up a 40B here soon, and wanted to get some opinions on different ways to set up a closed loop.

I was initially planning on having a single supply bulkhead on the back wall, and pump that through an SCWD (3/4") to two bulkheads near the top corners of the tank. Split off with locline/pvc from that point. Simple, but seems to be effective.

Then I start reading a little into bulkheads coming up through the bottom of the tank for jets pointed towards the rockwork. What is the real advantage to this method?

I'm really open to any ideas and suggestions for this, but I need some decent reasoning for some of these opinions.

So, what do you suggest?
 
I think you need more LEDs first. :D

Seriously, the only advantage I see in having returns lower/behind rock would be to keep detritus suspended in the water column so your surface skimming could pull it out and into the mechanical filtration media. I'd be paranoid about having returns through the actual bottom of the tank -- check valves can FAIL!
 
Dont need check valves in the closed loop. Nowhere for water to drain to. :)
 

TOP 10 Trending Threads

Back
Top
Home
Post thread…
Market
What's new