Well, today was another productive day. Here is an updated photo. Doing a water test tomorrow. Then I have to drill through the first floor to finish up the plumbing. Any ideas on going through the floor?
I was thinking about trying to do something along the lines of a receptacle box.
Of course with no electric, then use a blank cover on the box. Hole saw cover and box itself to have two 1" pvc sch 40. Go through this box.
Of course if I ever move, then I could switch the box and cover. Then make it an actual working outlet.
I am going to use a product call tigerflex. I sell it to pool and spa workers. It is a flexible sch 40 pvc that glues to normal ridgid pvc sch 40 fittings. It has a somewhat rubber feel to it, so I'm hoping that will help out with vibrations if there is any. Plus with the flexibility it will help me move it to the wall and convert over to the ridgid sch 40 you see in the picture.
Thanks again for the advice and ideas
Edit : also, was just dry fitting my equipment. I am going to use a stand on the skimmer. I'm contemplating on raising in a way that the discharge would be over the first under baffle if that makes sense? Idk, just a crazy thought.