I'm excited to have my plumbing mostly set up for my basement sump, but wanted to get any feedback on it before I start to glue. I'm at least going to glue the return line so I don't have any connections blowing off from pressure. Not sure If I'll test the drain lines before gluing or not.
This is a herbie style drain with one full siphon and one emergency/trickle drain. The full siphon line being the one with the ball valve (will be replaced with a gate valve in near future), and the line next to it is the emergency drain. The third line is the return pump line. I have a DC return pump, so I can use that to help fine tune the return rate untill I can get a gate valve to fine tune the drain rate.
I'm eventually going to put a filter pad at the drain outlet, but not sure how I'm going to do that just yet. I had a storage container that fit perfectly like a lid in the sump section, but was apparently brittle plastic and cracked apart when I tried to drill it.

This is a herbie style drain with one full siphon and one emergency/trickle drain. The full siphon line being the one with the ball valve (will be replaced with a gate valve in near future), and the line next to it is the emergency drain. The third line is the return pump line. I have a DC return pump, so I can use that to help fine tune the return rate untill I can get a gate valve to fine tune the drain rate.
I'm eventually going to put a filter pad at the drain outlet, but not sure how I'm going to do that just yet. I had a storage container that fit perfectly like a lid in the sump section, but was apparently brittle plastic and cracked apart when I tried to drill it.


