Feeding DOS off split tee from RO?

Dmax

Active Member
View Badges
Joined
Apr 28, 2015
Messages
234
Reaction score
247
Location
Texas
Rating - 0%
0   0   0
I am wanting to supply a DOS with one RO/DI line from my ATO reservoir. Using the DOS to provide ATO and feed thru a kalk stirrer. My concern is with setting up this way will the DOS pull the path of least resistance and reverse flow thru my kalk stirrer to feed the ATO demand?

Any input appreciated.
DOS.png
 

TX_REEF

Kessil Fanboy
View Badges
Joined
Mar 12, 2023
Messages
2,119
Reaction score
2,574
Location
Texas
Rating - 0%
0   0   0
I am wanting to supply a DOS with one RO/DI line from my ATO reservoir. Using the DOS to provide ATO and feed thru a kalk stirrer. My concern is with setting up this way will the DOS pull the path of least resistance and reverse flow thru my kalk stirrer to feed the ATO demand?

Any input appreciated.
DOS.png
I understand your concern, and I suppose it is possible - you could eliminate this issue by adding check valves:

 

GK3

Valuable Member
View Badges
Joined
Jan 16, 2017
Messages
1,852
Reaction score
1,339
Location
Cincinnati
Rating - 100%
2   0   0
I am wanting to supply a DOS with one RO/DI line from my ATO reservoir. Using the DOS to provide ATO and feed thru a kalk stirrer. My concern is with setting up this way will the DOS pull the path of least resistance and reverse flow thru my kalk stirrer to feed the ATO demand?

Any input appreciated.
DOS.png
You are using both heads of the dos, correct? one for kalk and one for ato? No splitting the output of one head?
 
OP
OP
Dmax

Dmax

Active Member
View Badges
Joined
Apr 28, 2015
Messages
234
Reaction score
247
Location
Texas
Rating - 0%
0   0   0
You are using both heads of the dos, correct? one for kalk and one for ato? No splitting the output of one head?
Correct. Splitting the Feed line before the Dos and output of one head to the Kalk reactor and the other to the ATO.
 

GK3

Valuable Member
View Badges
Joined
Jan 16, 2017
Messages
1,852
Reaction score
1,339
Location
Cincinnati
Rating - 100%
2   0   0
Then yes+1 to check valves. My understanding is the DOS does not always stop in a way that perfectly closes the lines so when one runs and the other is idle, you’d potentially pull some of the other out. You’ll need two check valves one on each input after the tee.
 
OP
OP
Dmax

Dmax

Active Member
View Badges
Joined
Apr 28, 2015
Messages
234
Reaction score
247
Location
Texas
Rating - 0%
0   0   0
Then yes+1 to check valves. My understanding is the DOS does not always stop in a way that perfectly closes the lines so when one runs and the other is idle, you’d potentially pull some of the other out. You’ll need two check valves one on each input after the tee.
Appreciate it. Going to set it up that way and see how it does.
 

Stuck to your aquarium: Do you put reef-related stickers on or around your reef system?

  • I have reef-related stickers everywhere!

    Votes: 2 6.1%
  • I have some reef-related stickers on or around my reef system.

    Votes: 7 21.2%
  • I have some reef-related stickers, but not on my reef system.

    Votes: 6 18.2%
  • I don’t have reef-related stickers, but I am interested in getting some.

    Votes: 3 9.1%
  • I have no interest in reef-related stickers.

    Votes: 15 45.5%
  • Other.

    Votes: 0 0.0%

New Posts

Back
Top