I'm planning on setting up my frag tank again (pics attached). It appears to be an advanced acrylics tank. It has a hole for a 1" bulkhead in the bottom and a hole for a 1/2" bulkhead on the back in the overflow box. Any suggestions on a good way to plumb this one. Last time I had it set up, I ran a durso and used loc-line to run the return over the top of the overflow. I had some thoughts of plugging the 1/2" hole and drilling a new hole on the other side to us a 3/4" bulkhead. Maybe there is something I am missing here. I'm not sure if It was drilled wrong by the previous owner or how he had it setup.
All input is welcome and appreciated.Thanks in advance.
All input is welcome and appreciated.Thanks in advance.
