New Setup Plumbing Help

dustinc

Well-Known Member
View Badges
Joined
Jan 26, 2010
Messages
543
Reaction score
473
Location
Waxahachie, TX
What state or country do you live in
Texas
Rating - 100%
3   0   0
I have a new Planet 120 that is being delivered tomorrow, and I'm working on my plumbing design. It is an internal overflow box that is pre-drilled with 4 holes (2 x 1" & 2 x 3/4"). It is obviously ran this way to run 2 drain and 2 return. I've ran Herbie before with great success, but I like the idea of the extra failsafe of the bean animal setup. I've thought about running 1 of the 3/4" drains as my main drain and the 2 1" pipes as the secondary and emergency. I plan on a 1000gph return pump with the goal of about 500 gph actual turnover between the sump and tank.

Has anyone done this and what are your thoughts?

Also, I could run Herbie and run the float switch for my return in the overflow box to shut off the return if the drains have an issue as well.
 

TOP 10 Trending Threads

WHAT DO YOU ALWAYS RUN OUT OF AT THE WORST TIME?

  • Salt mix

    Votes: 10 16.1%
  • Fish or coral food

    Votes: 4 6.5%
  • Test kits or reagents

    Votes: 4 6.5%
  • Filter media or replacement fleece

    Votes: 4 6.5%
  • RO/DI filters or supplies

    Votes: 10 16.1%
  • Fragging and repair supplies, like glue or epoxy

    Votes: 7 11.3%
  • I keep a backup of everything

    Votes: 18 29.0%
  • Other (Post in the comments)

    Votes: 5 8.1%
Back
Top
Home
Post thread…
Market
What's new