Randy Holmes-Farley
Reef Chemist
View Badges
Staff member
Super Moderator
Ultimate Member
Partner Member 2027
Excellence Award
R2R App User
Expert Contributor
Article Contributor
R2R Research
My Tank Thread
I managed with some help to get my tank (heavy Oceanic 120) onto the stand. Now I have to install bulkheads through the stand bottom. Not easy, but I managed.
Leak testing in the overflow: uh oh. 2 leaked right away, and one only showed drips 24 h later.
I do not recall having so much trouble last time...
The holes look to be designed for 3/4" bulkheads, and they go in fine, but there is too much play (gap between the bulkhead OD and the hole ID) and if they move around any, water begins to leak around it because the gasket (seemingly normal sized based on reading many online bulkhead descriptions) does not have enough overlap. Pulled them all back out and ordered larger OD rubber gasket that I hope work.
But maybe last time I used 1" bulkheads. I don't remember having 3/4" pipes in the overflow. Thought they were bigger... Tried my 1" and they just barely do not fit. In fact, they go in a little, jam, and are hard to get back out.
Next option was sanding down the threads a bit on a 1" bulkhead. Not too much because obviously they need to grip strongly. That seems. to work. It goes in, and at least as I pull on it, the threads hold.
Dilemma...
Go with 3/4" bulkheads, less possible flow, and still not sure if the wider gasket solves the problems
or
Sand down 4 of the 1" bulk heads, get higher flow, but maybe risk a thread failure.
I don't really care for plumbing... lol
Leak testing in the overflow: uh oh. 2 leaked right away, and one only showed drips 24 h later.
I do not recall having so much trouble last time...
The holes look to be designed for 3/4" bulkheads, and they go in fine, but there is too much play (gap between the bulkhead OD and the hole ID) and if they move around any, water begins to leak around it because the gasket (seemingly normal sized based on reading many online bulkhead descriptions) does not have enough overlap. Pulled them all back out and ordered larger OD rubber gasket that I hope work.
But maybe last time I used 1" bulkheads. I don't remember having 3/4" pipes in the overflow. Thought they were bigger... Tried my 1" and they just barely do not fit. In fact, they go in a little, jam, and are hard to get back out.
Next option was sanding down the threads a bit on a 1" bulkhead. Not too much because obviously they need to grip strongly. That seems. to work. It goes in, and at least as I pull on it, the threads hold.
Dilemma...
Go with 3/4" bulkheads, less possible flow, and still not sure if the wider gasket solves the problems
or
Sand down 4 of the 1" bulk heads, get higher flow, but maybe risk a thread failure.
I don't really care for plumbing... lol


