- Joined
- Dec 31, 2015
- Messages
- 513
- Reaction score
- 172
I am setting up a Reefer 350 with a mixing station in my garage. I could use some help with plumbing the mixing station.
I was planning on using 2 brute trash cans. I have a Neptune dos and FMM module in my garage that will perform the AWC from the saltwater brute can, and I am using a Neptune ATK in the sump with a pmup in my RO brute can to run as the ATO.
I am concerned with this setup that I will constantly be running my RODI unit to every time my tank tops off. I was planning to solve this by plugging in Neptune water level sensors as a high and low sensor and running a Neptune solenoid to start and stop the RODI. There will be a float valve for redundancy. My concern with this solution is that when I am ready to make salt water, my RO can will likely not be full. Is there a better method?
I was planning on using 2 brute trash cans. I have a Neptune dos and FMM module in my garage that will perform the AWC from the saltwater brute can, and I am using a Neptune ATK in the sump with a pmup in my RO brute can to run as the ATO.
I am concerned with this setup that I will constantly be running my RODI unit to every time my tank tops off. I was planning to solve this by plugging in Neptune water level sensors as a high and low sensor and running a Neptune solenoid to start and stop the RODI. There will be a float valve for redundancy. My concern with this solution is that when I am ready to make salt water, my RO can will likely not be full. Is there a better method?