Well, I'm working on it.
1/2 the plumbing
1/2 the new sump
Removed the drains for the 75 and my ATO runs out of a 5 gallon bucket refilled by Hydros control instead of the 25 gallon trashcan so I have room to work in the corner.
1/2 the plumbing

1/2 the new sump

Removed the drains for the 75 and my ATO runs out of a 5 gallon bucket refilled by Hydros control instead of the 25 gallon trashcan so I have room to work in the corner.
